⚡ Oxvelo Compliance Demo — This concept demonstrates how a major utility’s website can look — and function — while achieving full WCAG 2.1 AA, privacy, and security compliance. Independent proof of concept using fictionalized utility content — not affiliated with, endorsed by, or based on any live utility’s proprietary materials. Run Compliance Scan →

Distributed Generation

Connect your project to the grid

Solar, battery storage, combined heat and power — before any distributed generation system can operate in parallel with the grid, it needs an approved interconnection application. Here is the path.

Before You Apply

Eligibility essentials

  • Equipment certified to applicable interconnection standards
  • A licensed installer or engineer of record for the project
  • System size within the screening thresholds for your service type
  • A one-line diagram and site plan ready to upload
Most residential solar projects qualify for expedited review and are typically approved in a matter of weeks when applications are complete.
  1. Submit the application online with system specs, diagrams, and site details.
  2. Technical review — we screen for grid impacts; larger systems may need a detailed study.
  3. Sign the agreement and pay any applicable fees identified in the review.
  4. Install, inspect, energize — after a passing inspection you receive permission to operate.

Hosting Capacity Maps

Check available capacity in your area before you design — it can shape system size and study timelines.

Forms & Standards

Application forms, technical standards, and metering requirements for every system class, kept current in one library.

Pre-Application Help

Unusual site? Complex load? Our interconnection team offers pre-application guidance that saves redesigns later.

Contact the team

Generate your own — the right way

A complete application is the fastest application. Get your questions answered before you submit.